2015年10月21日星期三

Precise hydraulic fracturing design

Large water conservancy frac proppant selection and optimization design, the site has been in use is to repeat the test approach, in this more than 10 years, the continuous improvement of calculation model, obviously improves the feasibility of time and contains repayment cash flow rate of economic evaluation, the precise design.( ceramic proppant supplier )

  In order to obtain high flow capacity and the deep penetration of the fracture, fracturing design accurately is absolutely necessary. According to the reservoir conditions on individual applications conventional fracturing proppant selection, through the standard curve analysis and supporting agent property valuation determined.

没有评论:

发表评论