Before drilling machine operations , it is necessary to check each component , the water from the drainage holes into the well pipe . And commissioning organizations , recognizing normal , can the job.
Piling place needs a flat , solid, clean, no power lines, no obstructions , the well should not be playing too deep, usually 8-12m match fit. Underground no holes, no buried objects , rain no water , when moving away from the ground water level sm above , do not use the well type and construction safety zone should be set up to stop pedestrians entering or remaining . ties should be laid flat on the ground on a solid trajectory grounding resistance less than 10Ω, rail spacing error shall not exceed ± 0.6cm, track fittings plate convergence necessary strong.
Matters relating to the operation of maide Coal seam gas machinery is to have a strict rule , such as the most basic needs of the drilling machine operator that is necessary to certificates, so before drilling a large grain of salt added to the flower tube and abide by the safety rules and safety ten production discipline . drainage holes are not blocked so that salt gradually melted into the well ,
Power wires, motors and guillotine wiring is correct, outstanding insulation voltage error shall not exceed ± 5%, the construction of small -diameter tube wells , often use small drilling rig to the depth certainly will be processed under good wall pipe to the well if when two motors must operate together , should certainly every moment to launch when staking frame board when board over 10 ~ 20cm , should stop viewing, sustainable rise in various parts of the normal rear.
没有评论:
发表评论